Return to TheElectricBrewery.com
  [ Shop ]   [ Building ]   [ Using ]   [ Recipes ]   [ Testimonials ]   [ Gallery ]   [ FAQ ]   [ About Us ]   [ Contact Us ]   [ Newsletter ]

Log inLog in   RegisterRegister   User Control PanelUser Control Panel   Private MessagesPrivate Messages   MembershipClub Memberships   SearchSearch   MemberlistMemberlist   Photo AlbumsPhoto Albums   Forum FAQForum FAQ

60a eHERMS Build

 
Post new topic   Reply to topic   Printer-friendly view    TheElectricBrewery.com Forum Index -> Brewing Equipment and Setups
View previous topic :: View next topic  
Author Message
Nadeaunm5




Joined: 04 Jan 2017
Posts: 9



PostLink    Posted: Wed Jan 04, 2017 5:51 pm    Post subject: 60a eHERMS Build Reply with quote

Ill update this as I build it.

60 Amp Build.
2 EzBoil Controllers (1-boil, 1-HLT/MASH)
2- 5500w Boil Coils
3 RTD's (1- boil, 1- HLT, 1-Mash recirc. output into HLT)
2 Pumps
1 6 pole switch (3-NO, 3-NC) to switch the RTDs going into the HLT/MASH EzBoil)
No Key Lock
will be hardwiring the feed cable to the controller to cut down on the size of 60a receptacle

I tried to minimize the size of the panel by incorporating LED back lit switches for some of the items.

Bought all stuff through Auberins

Original Design



Cutout


Backplate



Front


bottom
Back to top
Display posts from previous:   
Post new topic   Reply to topic   Printer-friendly view    TheElectricBrewery.com Forum Index -> Brewing Equipment and Setups All times are GMT
Page 1 of 1
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum



Forum powered by phpBB © phpBB Group