Return to TheElectricBrewery.com
  [ Shop ]   [ Building ]   [ Using ]   [ Recipes ]   [ Testimonials ]   [ Gallery ]   [ FAQ ]   [ About Us ]   [ Contact Us ]   [ Newsletter ]

Log inLog in   RegisterRegister   User Control PanelUser Control Panel   Private MessagesPrivate Messages   MembershipClub Memberships   SearchSearch   MemberlistMemberlist   Photo AlbumsPhoto Albums   Forum FAQForum FAQ

50 amp Brewing Control Panel

 
Post new topic   Reply to topic   Printer-friendly view    TheElectricBrewery.com Forum Index -> Buy & Sell
View previous topic :: View next topic  
Author Message
matt6150



Joined: 07 Jan 2013
Posts: 32



PostLink    Posted: Fri Feb 08, 2019 1:54 pm    Post subject: 50 amp Brewing Control Panel Reply with quote

Brand new electric brewing control panel. This panel was modeled after Kal's design although smaller at 13.5ĒH x 12Ē W x 8Ē D because that's what I had available. Most of the components and features are the same. This panel is a 50amp panel that would allow back to back batches or two elements to be run at the same time. Auber instruments PIDís are the heart of the panel. One of the main differences in this panel is the use of a SWA-2451 PID for the HLT. This PID has a timer built in, so in conjunction with the alarm system you can use this feature to set a timer for when you want the HLT to start heating. For example, you could set the timer the night before brew day and wake up to hot water. The other PIDís are the standard SYL-2352ís. Another great feature to this panel is the main timer. It uses an Auber JSL-73 that letís you set up multi events. You can have an overall time and then other events for hop additions, whirlfloc or other things. Itís also very easy to set up and use. The temp probe receptacles are locking female XLRíS. The pump and heating element receptacles are NEMA twist to lock. It is the same receptacle's Kal uses so you could buy any of his premade temp/element cables. Any questions on what to buy for the mating half just let me know. The main power receptacle is a 50-amp California style. I am including the mating half, just add the cable. The volt/amp meter is an all in one unit that is self-powered. It also matches the PIDís very well with the red/green color scheme. Most other features are fairly basic. LED push button switches for pumps, timer alarm and power. Combo light/buzzer alarm. Standard switches for alarms and elements. And LED indicators for heating elements. Added bonus is that I welded nuts to the inside of the panel so you can bolt a standard TV mount to the back. If there are any questions about anything just let me know. Since I took these pictures, I have added labels to the bottom receptacles. Asking $2000obo.





Back to top
Display posts from previous:   
Post new topic   Reply to topic   Printer-friendly view    TheElectricBrewery.com Forum Index -> Buy & Sell All times are GMT
Page 1 of 1
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Support our site by purchasing through this link. We thank you!

Forum powered by phpBB © phpBB Group